Final Survey
This is to assure the bank and the building department that the construction is actually finished, and that all the improvements paid for were completed.
Here's what it entails:
* nothings "proposed", nothings "forms" anymore, no previous form are `open'
* nothing is "to be verified in field" anymore
* must say "finish floor elevation=", "garage elevation = "
* flood zone
* show closest ties on 4 sides - scale all ties
* show ties to wet face of pool - also to pool deck.
* show more dimensions on concrete than for a mortgage survey
* erase `vacant', `occupied' and `bldg under construction' from all lots
* pond and pond detail must be shown (this is when they're used)
* show pond size and max size.
* show edge/water and top/slope and use arrows for ties.
* unincorporated palm beach county requires topographical survey showing drainage.
So does royal palm beach, crestwood, la mancha, willows
* lot and building corners, , swale and flow arrows
* revision and change date
* show well and septic and distance between them
* if elevations were ever proposed do drainage certificate
Also if in county or wellington
* get/keep prior revisions
* log bm
* sign and stick
* check notes
* survey type is final survey (accept update)