Site Plans



* do drawing checklist first
* title is boundary and site plan
* revision note if needed
* review title commitment and note it (if in package or requested)
* architect's plans generally show the road on the bottom
(Rather than north on top)
* septic tank should be center of lot
75' from lake or canal
* adj lots vacant or occupied (well & septic within 100')
Note adjacent f.f. Elevs
Note no wells or no septic
Note public wells or sewers
* flood zone w/map info
* all right-of-way info (used for setbacks)
* lot area (gross and net)
* porches must not violate setbacks ( sidewalks & driveways can).
* driveway, entrance and walk, wing walls, and porch must appear as on
Plans, including notation, or permit may not be issued.
* city-type sidewalks may be required despite not being on plans.(Check)
* centerline road, swale, and lot corner elevations required by county to determine necessary fill.
* close building (existing and new)
For building stakeouts - include overalls -
Add through and scale setbacks and overalls - compare to lot line
(This is where you'll get nailed)
* scale building setbacks & distances
* tie building on four sides
* issue a boundary survey and a survey with site plan (two drawings)
* elev's on core site, all corners, top of water, Road.
* site benchmark, ngvd note, legend, base bench
* hrs forms
* altera forms no longer done by us
* certify compliance with title commitment - schedule a as well as
Schedule b (get schedule and docs from title company)
* include note: driveway swales to meet p.bch. Co. Requirements
* draw in drainfield and unobstructed area